Are you building a house?
The building process - To-do-list!
OBTAIN A BUILDING PERMIT
- Send a building application to the Building Committee (Byggnadsnämnden).
- Appoint a site evaluator.
APPROVAL OF THE WATER AND SANITATION INSTALLATIONS BY VA SYD
- Send both the water and sanitation drawing and floor plan to VA SYD.
- Service pipe application and site plan should be sent at the same time.
- Submit an application for water meter subscription to VA SYD.
INSPECTION OF THE WATER AND SANITATION INSTALLATIONS
- The site evaluator contacts VA SYD when it is time for inspection.
WATER SUPPLY DURING THE BUILDING PERIOD
- If water is needed during the building period, it can be ordered at VA SYD.
CONNECTING TO THE WATER AND SANITATION NETWORKS
- Contact VA SYD for service pipe connection by our contractor.
- Pay the connection fee.
- The service pipe shall be pressure tested, and VA SYD shall be present. Contact VA SYD.
- Apply for a water meter installation at VA SYD.
Contact VA SYD